The Golden Gate Bridge in San Francisco uses 129,000 kilometres of wire in its two main cables.

If you used 4.00mm wire you could possibly save USD $117,990 (thats USD $10 per tonne of wire in Zinc material saved)

Estimate your savings with EMW

Payoffs for drawn wire solutions

At the start of the process the wire pays off turntables and overhead Wapping arms or spool units, and on through guide rollers for entry into the cleaning and rinsing section.

For low, medium and high carbon wire

  • Payoff design is dependent on wire speed
  • Coil payoff
  • Spool payoff
    • Vertical or horizontal spool
    • Mechanical or motorised braking
    • VARIABLE spool sizes